Dormac: The delivery sets the first impression
For more than thirty years, Dormac CNC Solutions and Jan van Dam have been working together to ensure the perfect start for every new machine.
Over the years, we have been involved in many interesting and diverse projects. Which is something we are very proud of. So we’d be happy to highlight some of them for you.
For more than thirty years, Dormac CNC Solutions and Jan van Dam have been working together to ensure the perfect start for every new machine.
When completion of a new location is delayed, flexible storage and delivery offer a solution. One partner handles transport, storage, and installation without extra intermediaries.
Transport and installation of machines during TechniShow 2026, including full logistical coordination and planning for our clients.
This project is a great example of “We cover it all.” Under the direction of our sister company Jan van Dam Global Machine Logistics, we managed the road transport and installation as one integrated international logistics operation.
FMI is located in Bergen op Zoom. This company is essentially a customer of our customers. By this, we mean that we have regularly been commissioned to unload and place machines at FMI. As a result, they have a diverse range of machinery.
We handled the complete logistical planning from setup to dismantling. One point of contact for transport, setup coordination, and communication with all exhibitors.
Our technicians dismantled, transported, and installed all the machines. Thanks to a single master plan, the relocation was completed on time and without any production downtime.
We relocated existing machines and installed eleven new milling machines. In collaboration with Jan van Dam GML, we unpacked, repacked, and assembled them at multiple locations.
A Toyoda FH12500SX-i milling machine was unpacked, repacked, transported, and installed. Together with Jan van Dam GML, our team handled the transport, internal relocation, and mechanical assembly.
We dismantled a unique panel press in Germany, arranged international road transport, and reinstalled the line at its new location in the Netherlands.
From Spain to Vlaardingen: transport, internal relocation, and precision installation in a tight space. Millimeter-accurate work carried out using our own internal transport equipment.
We dismantled, relocated, and installed the Avure HPP machine. Our installation team completed the project within nine consecutive days.
For Kiremko B.V., we replaced a 20,000-kg drum in the middle of the factory hall. After extensive planning and calculations, a creative solution was developed to complete the task.
For Marel, we relocated heavy production lines and a welding robot installation. Thanks to professional execution and step-by-step planning, the production process continued uninterrupted.
The Jan van Dam Group is represented in two companies:
Keep up to date with the latest news and projects.
Assembly/disassembly and anchoring
Relocating and installing machines
Machine storage
Industrial relocation
National and international road transport
Truck-mounted cranes
Tractors and trucks
Forklifts and aerial platforms
Lifting portals
Wilgenweg 20
3421 TV Oudewater
The Netherlands
Dolfijnweg 4
3199 MD Rotterdam
The Netherlands
Industrieweg 44
4538 AJ Terneuzen
The Netherlands
Tel.: +31 (0)348 - 564 540
info@janvandamtransport.nl
info@janvandamgml.com